St Anne’s Central School Expansion
Location: Temora, NSW
Customer: Private Property
Saint Anne's Central School refurbed the original buildings & installed new air conditioning throughout the school. With the new air conditioning loads the school needed an additional 230 amps. Inland Power Solutions were able to provide that by installing a new 315kva substation.
Scope of work:
- Upgrade existing 4 low voltage power poles in Loftus Lane, Temora with new 14m timber poles to extend high voltage overhead to school location
- Installation of 315Kva pole mount substation