• Banner - Projects - Jindera

Jindera Industrial Estate

Greater Hume Shire new 15 lot industrial estate on the southern boundary of the existing Jindera Industrial Estate, right on the door step of Albury/Wodonga.

Inland Power Solutions have been engaged by Greater Hume Shire to Build the Overhead / Underground Electrical Reticulation for the 15 Lot Industrial Subdivision.

The Subdivision required:

  • Thirteen New Power Poles bearing High Voltage and Low Voltage Overhead Conductor
  • Two 315kva Pole Mount Transformers
  • Underground Low Voltage was installed to supply two Industrial Pillars within the cul-de-sac

Gallery

Enquiry

T. 02 6925 0041