Jindera Industrial Estate
Greater Hume Shire new 15 lot industrial estate on the southern boundary of the existing Jindera Industrial Estate, right on the door step of Albury/Wodonga.
Inland Power Solutions have been engaged by Greater Hume Shire to Build the Overhead / Underground Electrical Reticulation for the 15 Lot Industrial Subdivision.
The Subdivision required:
- Thirteen New Power Poles bearing High Voltage and Low Voltage Overhead Conductor
- Two 315kva Pole Mount Transformers
- Underground Low Voltage was installed to supply two Industrial Pillars within the cul-de-sac
Gallery